2023 Ordering Experience

My 22 refresh with premium package shows only power on drivers side on the build sheet. In the 22 refresh brochure it shows power passenger only on the AT4X and Denali Ultimate.
I asked on another forum and the reply was that the 22 refresh has power adjustable front passenger seat.
 

Order is 4200 status on 10/24/22 with no ETA as of yet.

Confirmed from the Fort Wayne Plant.
Order has been backed down to 3800 status…Dealer isn’t sure why and GMC chat said it was erroneously marked as 4200. Hoping it gets here before the Thanksgiving but I’m not hopeful.
 

New here

2023
Desert sand metallic
Duramax 3.0
Crew cab
6.5 ft bed
18"
Premium package
Preferred package
Switched running boards and added mud flaps

Placed order with dealer 10.15.22
Hopefully we get allocation this Thursday
My dealer received allocation for my build yesterday, 11.3.22. He is claiming they have been seeing a 6-8 week window to take delivery. 1 step closer.
 

An update... My truck is now at 4200 status (shipped) with a delivery ETA of 11/7.
Final update: I took delivery of my 2023 AT4X yesterday. Although the original delivery ETA was 11/7, it actually arrived at my dealership in Central Texas on 11/1. (It was manufactured at the plant in Mexico.)
 

Attachments

  • 23 AT4X.webp
    23 AT4X.webp
    186 KB · Views: 141
Any recommendations for a dealer in New England to place an order with?
 

Truck is still sitting in a lot waiting to be shipped and dealer isn’t optimistic that it will be shipped any time soon. GMC customer service is quoting up to 12 weeks to deliver from date of manufacture. Hope to see it by Thanksgiving but that may be naive.
Final update: I happened to get lucky yesterday and stumbled upon the exact same build that was in stock at another local dealer and it now sleeps in my driveway. I hope the manufacturing and shipping gods smile on all you folks and you get your builds in a reasonable timeframe.
 

'23 AT4 Diesel w/20' wheels loaded, but no steps or sunroof...dealer ordered 8/8/22...been sitting at event 2030 for weeks. Dealer has 8 AT4's (50% diesels) in the cue....says all held up by Allocation...currently no AT4's and No Diesels. Are others getting this same story...just curious...I have bought a dozen vehicles from the dealer and have no reason to doubt my guy. He did say to expect it to take 6 months possibly...but I was hoping SC constraints had been getting better.
 

Update order status: 3300 ORDER SELECTED, SCHEDULED FOR PRODUCTION
Talked to my dealer today, and I'm excited. Maybe I will have it in my hands before winter is over.
Dealer texted today, said my AT4 is scheduled for production this week. Someone from GM called 30 minutes later, said it is scheduled for production on 11/21. I'm not sure who is right but I'm getting closer.
 

My dealer received allocation for my build yesterday, 11.3.22. He is claiming they have been seeing a 6-8 week window to take delivery. 1 step closer.
Heard from GM today. The running boards are on constraint so my salesman deleted them from the order to speed up things from GM. Dealership will install upon arrival. Waiting on GM to accept the revised order.
 

If anyone is looking and interested , I have a deposit down on a 2023 GMC AT4 that’s built and should be shipping any day from Ft Wayne, IN. The dealer is in Alabama. I ordered 2 trucks and the other dealer’s delivered first.

2023 GMC AT4
Summit White
3.0L Duramax LZO
Fully Loaded
Premium package
Technology Package
High clearance steps
20” Wheels
Under seat storage
Sold at MSRP $72,175 minus any GM incentives at the time of delivery
Let me know if interested and I can send the build sheet.
 

New Posts

Most reactions

Back
Top